Loading...

Project Detail

Redesign of House of the Rock Auditorium, Abuja

On the 25th of June 2017, the HOTR auditorium was razed down by an inferno. The cause of the inferno is yet to be ascertained. As a result of the damage caused by the inferno, it was decided that a new auditorium with higher capacity be designed to integrate into the already existing facility and Tower Abuja.

Project Description

Client: House on the Rock, Abuja
Location: Abuja
Surface Area:
Year Completed:
Project Category: Religious